Performance and Sales Record
| NO | MONTH & YEAR | PROJECT | CUSTOMER | LOCATION | ||||||||||
| 1 | DEC. 2003 ~ FEB. 2004 | REPLACEMENT IDO PIPE IN JETTY AREA | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 2 | MAR. ~ APR. 2004 | FABRICATION & INSTALLATION OF SCREW CONVEYOR ( 60TPH ) | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 3 | SEP. ~ OCT. 2004 | FABRICATION AND INSTALLATION BUCKET ELEVATOR 431 BE1 | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 4 | OCT. ~ NOV. 2004 | FABRICATION, ERECTION & COMMISSIONING HOPPER ( 431HP1 ), BIN (431BI1 ) & BELT CONVEYOR SYSTEM( 431BC1 ~ BC4 ) | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 5 | JUN. ~ AUG. 2005 | INSTALLATION FOR HYDRANT PIPE EXTENSION AT JETTY AREA PHASE II | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 6 | JUL. 2005 ~ FEB. 2006 | TARJUN LOGISTIC PROJECT MODIFICATION CONVEYOR ( UPGRADE CAPACITY FROM 600 MTPH TO 800 MTPH) | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 7 | OCT. 2004 ~ FEB. 2005 | GENERAL CONSTRUCTION FOR FACTORY MAINTENANCE WORK | PT. PANGGUNG ELECT. | CORP. WARU - SIDOARJO | ||||||||||
| 8 | DEC. 2006 ~ MAR. 2007 | LATERITE STORAGE EXTENSION 40 X 30. FABRICATION AND ERECTION LATERITE STORAGE | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 9 | DEC. 2006 ~ MAR. 2007 | TRASH STORAGE 40 X 20, FABRICATION AND ERECTION | PT. INDOCEMENT TUNGGAL PRAKARSA P-12 | BATULICIN - BANJARMASIN | ||||||||||
| 10 | APR. 2007 | 30 T/H REHEATING FURNACE FABRICATION AND INSTALLATION | PT. HANIL JAYA STEEL | WARU - SIDOARJO | ||||||||||
| 11 | AUG. 2007 | DI SMAN TLE AND INST ALL BOILER PART INCLUD E PRECOMMISSIONING, COMMISSIONING AND START UP | PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA | TUBAN - JAWA TIMUR | ||||||||||
| 12 | OCT. 2006 | MECHANICAL ERECTION AND COMMISSIONING WORK FOR LIMESTONE HANDLING PROJECT | H - TECH | TARAHAN | ||||||||||
| 13 | NOV. 2006 | ELECTRIC INSTALLATION OF LIMESTONE HANDLING PROJECT | SHIN HEUNG C & T | TARAHAN | ||||||||||
| 14 | NOV. 2007 | CONSTRUCTION WORK OF LATERITE STO RAGE ROOFING EXTENSION PROJECT | PT. TRANS PACIFIC PETROCHEMICAL INDOTAMA | BATULICIN - BANJARMASIN, KALSEL | ||||||||||
| 15 | JUL. 2008 | ROP GRANULE II PLAT, CAP. 500.000 MTPY | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 16 | JUL. 2008 | NPK GRANULATION II IA ND IV PLANT PROJECT CAP. 2 X1 00.000 MTPY | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 17 | AUG. 2008 | GRANULATION INTERNAL SUPPORT | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 18 | AUG. 2008 | DUCTING NPK III & IV PROJECT | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 19 | SEP. 2008 | CYCLONE ROP II | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 20 | SEP. 2008 | SUPPORT DUCTING & SUPPORT OVERHEAD CRANE | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 21 | OCT. 2008 | FABRICATION & INSTALLATION OF DUCTING ROP GRANULASI II | PT. KRAKATAU ENGINEERING PETROKIMIA-GRESIK, | JAWA TIMUR | ||||||||||
| 22 | OCT. 2008 | MISCELLANEOUS MECHANICAL STEEL WORKS FOR C26 PROTESEA PROJECT | PT. DAEYANG ROLLENT INDONESIA GRESIK, | JAWA TIMUR | ||||||||||
| 23 | NOV. 2008 | FABRICATION & INSTALLATION FO DUST HOPPER AND BUFFER HOPPER - ROP GRANULASI II | PT. KRAKATAU ENGINEERING | PETROKIMIA-GRESIK, JAWA TIMUR | ||||||||||
| 24 | NOV. 2008 | FABRICATION HOPPER & COAL BIN ROP GRANULASI II | PT. KRAKATAU ENGINEERING | PETROKIMIA-GRESIK, JAWA TIMUR | ||||||||||
| 25 | APR. 2008 | TARJUN LOGISTIC NEW JETTY PROJECT | PT. INDOCEMENT TUNGGAL PRAKARSA TBK.P - 12 | BATULICIN - BANJARMASIN | ||||||||||
| 26 | JAN. 2009 | DUCT, CYCLONE, COAL BIN & CHUTE FABRICATION AND ERECTION WORK ( ROP GRANULATION II PLANT ) | PT.KRAKATAU ENGINEERING | PETROKIMIA-GRESIK,JAWA TIMUR | ||||||||||
| 27 | JAN. 2009 | ENGINEERING, PROCUREMENT & FABRICATION WORK FOR MATERIAL HANDLING CONVEYOR ( ROP GRANULATION II PLANT ) | PT.KRAKATAU ENGINEERING | PETROKIMIA-GRESIK,JAWA TIMUR | ||||||||||
| 28 | JAN. 2009 | ENGINEERING, PROCUREMENT & FABRICATION WORK FOR DUCTING ( RFO PF II PLANT ) | PT.KRAKATAU ENGINEERING | PETROKIMIA-GRESIK, JAWA TIMUR | ||||||||||
| 29 | SEPT. 2009 | DEMOLTION/FABRICATION & INSTAL DRY CYCLONE | PT. PETROJAYABORAL PLASTERBOAD | GRESIK, JAWA TIMUR | ||||||||||
| 30 | AUG. - SEPT. 2009 | 45 TONS ARC FURNACE - LADLET RANSFER CAR | PT. HANIL JAYA STEEL | SIDOARJO, JAWA TIMUR | ||||||||||
| 31 | SEPT. 2009 - FEB. 2010 | FABRICATION & ERECTION FUEL OIL & FIRE WATER STORAGE TANK | PT. HANIL JAYA STEEL | PLTU LUMPUNG - BD, LAMPUNG | ||||||||||
| 32 | OCT. - NOV 2009 | DEDUSTING FACILITIES PLANT | PT. HANIL JAYA STEEL | SIDOARJO, JAWA TIMUR | ||||||||||
| 33 | MAR. 2010 | SCREW CONVEYOR EPC | PT. HANIL JAYA STEEL | SIDOARJO, JAWA TIMUR | ||||||||||
| 34 | JUL.2010 | ESP FABRICATION & INSTALLATION | KC-COTTRELL CO.LTD | GRESIK, JAWA TIMUR | ||||||||||
| 35 | AUG. 2010 | FABRICATION COOLER CASING & KILN HOOD | PT. BOMA BISMA INDRA | GRESIK, JAWA TIMUR | ||||||||||
| 36 | SEPT. 2010 | FABRICATION & HOT GAS DUCT INSTALLATION | PT. YIN | GRESIK, JAWA TIMUR | ||||||||||
| 37 | 0CT. 2010 | EPC CONVEYOR SYSTEM | PT. YIN | GRESIK, JAWA TIMUR | ||||||||||
| 38 | DEC. 2010 | FABRICATION & INSTALLATION SILICA & LIMESTONE HANDLING SYSTEM | PT. SEMEN GRESIK | TUBAN, JAWA TIMUR | ||||||||||
| 39 | JAN. 2011 | FABRICATION & INSTALLATION GYPSUM/TRASS TRANSPORTATION SYSTEM | PT. SEMEN GRESIK | TUBAN, JAWA TIMUR | ||||||||||